Drive cap nails 6 to 8 inches apart in rows along the top and bottom of the sheets as well as in a row in the middle.
Torch roofing felt installation.
Torch down roofing comes in the form of rolled sheets.
Installing the roofing felt does take care but can go very quickly.
Installing the torch down roofing involves flames and melted asphalt.
Torch down roofing sometimes referred to as torch on roofing is so named because it requires an open flame propane torch.
These thick layers of roofing felt are installed by heating the back of the felt with a butane torch and then carefully applying it to the roof.
Choose heat resistant gloves and boots made of a material like kevlar.
Hold the gun at a 45 degree angle with the nozzle pointed downwards.
You will need to use your gloves and boots on occasion to roll or press down on the bitumen sheets as they bubble.
Torch down roofing is a type of roofing material that has been designed for low angle or flat roofs.
Watch this video if you want to learn how to use a propane torch on a flat roof.
Also cover up with long sleeved clothing to reduce the chances of an accident.
Nail metal drip edge flashing which bends over the roof and down the edge of the facing board on all roof edges.
Cover all nail heads with roofing mastic for long term roofing.
In this installation method sheets of modified bitumen are rolled out onto the roof and a roofing professional uses a hand held propane torch to heat the material and adhere it to the surface.
Apply extra heavy typically 43 pound roofing felt over the sheathing old roof or the insulation.
Pull the trigger of the gun and move the nozzle around the circumference of each nail.
Fasten drip edge on eaves with.
While it can last up to 20 years installing torch down roofing can be a dangerous process and as such tends to cost more than traditional roofing materials.
If this felt is more than a temporary waterproofing measure apply roofing mastic using a caulking gun.
This will help you get started and you will also learn some tricks.
Your roofing contractor will unroll each sheet individually during the installation process two sheets for two layer three sheets for three layer.